Fruit Center P1
    Fruit Center P2
    Central Bank RF Building
    Water Collection Tunnel
    Navab Residential
  Water Park
    International Airport
    TSP Labor Camp
    South Pars Admin Building
    Pipeline for TSP Refinery
    4th Aromatic Plant
    TSP Operation Camp
    Main Building & Site Preparation
    Steam Turbine production Plant
  DamP2&P3
  Dam TS4D14
    Melat Bank
    Control Traffic Tower & Dependent Buildings

Azadegan Water Park

Tehran, Iran
  Client: Tehran Municipality-Azadegan Water Park
Consultant: Terican Consulting Engineering
Contract Value : 360,198 US$
Completion Date: 1997
 
 

This spectacular creational facilities was designed by Herry International of Atlanta USA -  The  work consist of several pools  and  slides as well as 600m of winding river and 1600 m2 wave pool.

 

© Abej Construction Company 2010 | abejco@abejco.com